PSIPre-shipment

Pre-Shipment Inspection

When at least 80% of production is complete, we check quality, dimensions, function and packaging before the goods are loaded. Defects found can be corrected while the rest of production is still running.

Pre-shipment inspection – Quality control before loading
Quality control before loading
When?At 80%+ of production
SamplingISO 2859-1 · AQL
AdvantageRoom to correct before loading
OutcomeConformity report + correction plan
About this service

Pre-Shipment Inspection

Pre-Shipment Inspection (PSI) is carried out when at least 80% of production is complete, before loading. Our inspector draws samples from finished and packed goods according to ISO 2859-1 (AQL), and checks them against the golden sample, the technical specification and the order instructions.

Because part of production is still running, PSI gives you a chance to step in before shipment: a correction plan is agreed with the factory for the defects found, so the remaining production is not finished with the same defects. The report shows whether the shipment can go ahead as planned.

PSI scope
01

Quantity and production status

Completed, packed and in-production quantities compared with the order.

02

Conformity to sample and specification

Model, colour, materials and accessories compared with the golden sample and technical file.

03

Workmanship and visual check

Surface, assembly, stitching, coating and finish quality on units selected by AQL.

04

Measurement and function tests

Measurement chart and tolerances per product; opening and closing, assembly, load, stability, and operation tests for electrical products.

05

Labels, marking and packaging

Product label and barcode scan check, markings such as CE, cartons and shipping marks.

06

Correction plan

Corrective action agreed with the factory for the defects found, and preventive measures for the remaining production.

Step by step

How does PSI day run?

  1. 01Review of the order, sample and specification
  2. 02Establishing production status and quantity
  3. 03Sample selection by AQL
  4. 04Workmanship, measurement chart per product and function
  5. 05Label, barcode, carton and packaging check
  6. 06Findings, correction plan and report
“Our aim is to catch defects before loading and before production ends, creating a chance to correct them and prepare the shipment with confidence.T&S Global Inspection

Get a quote for Pre-Shipment Inspection.

Share the product, order quantity and date, and we’ll send you the checklist and a man-day quote within the same business day.