CLSLoading

Loading Supervision

We are the last checkpoint before your goods leave the factory. For container, truck or groupage loading, we check the vehicle, supervise loading from start to finish, and stay on site until the doors are closed and sealed.

Loading supervision – T&S inspector at loadingLoading supervision – Loading and stacking supervision
T&S inspector at loading
When?Loading day
VehicleContainer · truck · groupage
Inspection7-point + count + stacking
OutcomeSame-day report, seal no.
About this service

Loading Supervision

Before loading starts, our inspector checks the vehicle: for containers, a 7-point inspection confirms there is no damage, holes, damp, odour or hidden compartments; for trucks, the body, floor, tarpaulin and securing equipment are inspected. The inspector then supervises loading from start to finish, counting cartons and checking stacking and securing.

A final photo is taken before the doors close, the seal number is recorded, and a photo report is sent the same day. This documents that the right product was loaded in the right quantity, undamaged, onto the right vehicle.

CLS is the closing step of a process that starts with supplier verification and DPI: the whole chain, from choosing the factory to the sealed door, is watched by the same independent eye.

CLS scope
01

Container 7-point inspection

Outside and undercarriage, doors, right and left walls, front wall, ceiling and floor are inspected one by one.

02

Cleanliness, damp and odour

The container must be dry, clean and odour-free, with no light entering when the doors are closed.

03

Marks and packing list

Shipping marks and barcodes on the cartons matched against the packing list.

04

Carton count

Every carton is counted as it passes through the doors, and the quantity is compared with the packing list.

05

Stacking and securing

Weight distribution, void filling, chocks and desiccants; for trucks, load securing according to EN 12195-1.

06

Truck and groupage loading

Vehicle / number plate matched with the CMR and shipping documents; for groupage, counting and separating only your cartons.

07

Sealing and report

Final photo before the doors close, seal number recorded, and a same-day photo report.

Before loading

Container 7-point inspection.

Before loading starts, we inspect the empty container using the C-TPAT 7-point method. Every point is photographed and added to the report.

1234567
  1. 1
    Outside and undercarriageSupport beams visible and undamaged; no unusual repairs.
  2. 2
    Doors and locking mechanismHinges, locking bars and seals intact; seal housing works.
  3. 3
    Right side wallNo holes, dents or repair marks; any inside repair is also visible outside.
  4. 4
    Left side wallSame checks; inner and outer surfaces match.
  5. 5
    Front wallCorrugation and corner blocks in place; no false wall.
  6. 6
    Ceiling / roofBeams visible; no holes or light leaks.
  7. 7
    FloorFlat, even height, dry and clean; no unusual repairs.
Beyond containers

The same care for truck and groupage loads.

Loading supervision is not just for containers. For full truck loads and groupage shipments too, we check the vehicle, the count, the securing and the documents on site.

Full truck load

  • Body, floor and tarpaulin check; cleanliness, damp and tears
  • Number plate and vehicle details matched with the CMR and shipping documents
  • Load securing according to EN 12195-1: lashing straps, anti-slip mats, edge protectors
  • Carton / pallet count, stacking pattern and closing photo; seal or TIR cord record

Groupage / LCL

  • Counting only your cartons; matching with the packing list
  • Carton marks and labels; pallet stretch-wrapping and pallet labels
  • Separation from other cargo, and a photo of its position in the vehicle / warehouse
  • Same-day report with the delivery note or warehouse receipt
Step by step

How does loading day run?

  1. 01Empty vehicle check (7-point for containers)
  2. 02Cartons, marks and packing list
  3. 03Carton count during loading
  4. 04Supervision of stacking and securing
  5. 05Final photo before the doors close
  6. 06Sealing and same-day report
“Our aim is to help our clients complete every shipment safely, in order and in full, so their products reach the market without problems.T&S Global Inspection

Get a quote for Loading Supervision.

Share the product, order quantity and date, and we’ll send you the checklist and a man-day quote within the same business day.